What happens after the humanitarian project ends?

The first repair can reveal decisions that were missing from the original design.

Alberto Preato4 minute read
Black, cream and vermilion ribbons woven into a folded surface. Conceptual D4H illustration.
Conceptual D4H illustration · Illustration by Alberto Preato, created with AI assistance for Design for Humanity, 2026.

Imagine returning to a completed project when something ordinary has gone wrong. A fitting has broken. A roof needs attention. The person who administered the service has moved on. The question is no longer whether the intervention could be delivered. It is whether someone has the means and authority to keep it useful.

In shelter and recovery work, I have seen people continue changing what was provided: adding shade, creating privacy, altering entrances, making room for work or social life. I wrote about those observations from Haiti, Vanuatu, Iraq and elsewhere in an earlier article. Here I want to examine the responsibilities that remain around that adaptation, after the original project team is no longer there.

The budget after the budget

The WASH sector has developed a useful discipline for this question. IRC’s life-cycle costing approach considers the expenditure required to sustain a service, including routine operations, major repairs, support and eventual replacement, as well as initial construction. [1] It makes it harder to mistake the cost of installing infrastructure for the cost of providing the service people need.

The same question can be asked of a reception space, a community facility or a digital platform. Each has a different pattern of costs and dependencies. A low purchase price may come with parts that are difficult to replace locally. A platform may depend on recurring fees and specialist administration. A building may remain physically sound while the budget for staff, cleaning or accessible transport disappears.

These are examples to test during design, not reasons to reject every technically ambitious intervention. Sometimes specialist equipment is justified. The case for it should include the support arrangement that makes the choice workable, and what happens if that arrangement ends.

Local ownership can become a transfer of liabilities if responsibility arrives without resources or authority. An institution may accept a facility while lacking funds for its operation. Residents may keep a service functioning through unpaid work that never appears in the project’s costs. Calling the result sustainable would require asking who is sustaining it, under what conditions, and for how long.

What should continue?

Two people position a vermilion structural support beneath a long black beam.
Resources that carry responsibility · Illustration by Alberto Preato, created with AI assistance for Design for Humanity, 2026.

The OECD’s evaluation framework defines sustainability in terms of continuing net benefits and the capacities needed to support them. [2] That distinction is valuable: the survival of an asset is only one part of the question. A service may adapt, move or close while some benefits continue. A building may remain in place while its intended benefit has disappeared.

Emergency work makes this especially important. Temporary interventions do not all need to become permanent. Some should close safely when their purpose has ended. Others need a transition into public or community systems. The decision should reflect the needs and options of people relying on them, rather than an automatic preference for either indefinite continuation or a clean administrative exit.

Designing the conditions of handover

I would want a handover discussion to include the next likely repair, the next recurring bill and the next decision about changing use. For each, there should be a credible answer about who can act, what resources are available and where unresolved problems go.

The receiving organisation needs room to question the arrangement. Training someone to operate a system does not give them a budget, a supply chain or permission to modify it. Those conditions may require negotiation with government, donors, suppliers and the people using the service long before the handover ceremony.

Elrha’s 2025 learning report on six innovation-adoption projects offers a related warning. Drawing on project documents, interviews and workshops, it identifies the substantial adaptation and organisational work required to introduce an innovation into another setting. [3] Evidence from six projects cannot establish a universal formula, but it reinforces a practical point: adoption has work and costs of its own.

This matters for funders as well as implementers. A proposal could distinguish delivery costs from the costs of continued use, identify which are financed and state what remains unresolved. Follow-up could examine service interruptions, repair times, changing use and who carries the expense. The appropriate period would depend on the intervention; a brief closing visit cannot answer every long-term question.

Attribution also needs care. Later failure may reflect conflict, displacement or a financial shock beyond the project’s control. A serious review would examine those conditions alongside design and handover choices, rather than making every breakdown proof of a bad project.

I would welcome more accounts that return after the reporting period and ask the people now responsible what they inherited. Their answer might change what we choose to fund, procure and promise next time.

References

  1. IRC, Life-cycle costing / WASHCost methodology. Method summary retrieved through IRC’s indexed description; no historical monetary benchmarks or new effectiveness estimates are used.
  2. OECD, Applying Evaluation Criteria Thoughtfully, 2021, sustainability section. Evaluation framework, not evidence that a particular project is sustainable.
  3. FLUSH Associates / Elrha, Adopting Humanitarian Innovation: Key Lessons from an Adoption Challenge, 25 September 2025. Synthesis of six projects, not a controlled impact evaluation.